Project Management Planning to Increase Company Resource Efficiency and Effectiveness in Indonesia
Keywords:
Work Breakdown Structure, Activity On Arrow, efficiency, project managementAbstract
This study aims to develop global project management activities in the form of Work Breakdown Structure (WBS) and create project scheduling with Activity On Arrow (AOA) diagrams and barchart/gannt chart. So that with the preparation of the right WBS and AOA, the success of project management planning will be achieved. This research was conducted using a method starting from the findings of the problem, determining the research objectives, collecting and processing data, to the conclusion. The steps taken include: Perform (WBS) of project activities and create a sequence of project activities, so that they can be analyzed with (AOA), and barcharts. the following conclusions showed that Activity On Arrow takes 23 days to determine the HR requirements needed in the preparation of project management plans, while Barchart takes 23 days to determine the HR needed in the preparation of project management plans.
References
References
Dewi DP, I Gusti Ketut Sudipta, Dewi Suci Setyowati, 2016, Analysis On The Aspects Of
Human Resources Toward The Performance On The Construction Project In The Regency Of
Badung
Dimyati, DH, & Nurjaman, K. (2014). Project management. Yogyakarta: Faithful Library.
Widiasanti, Irika and Lenggogeni. (2013). Construction management. Bandung: PT.
Rosdakarya Youth.
Noerlina. 2008. Information Systems and Technology Project Management Planning. Online
Business Information. Journal of Warta Tools Vol.11 No.3, 440-450.
Rev, E. (2003). Work Breakdown Structure. America: US Department of Energy
Suharto, I. (2002). Industrial Project Feasibility Study. Jakarta : Erlangga Sortrakul, N.,
Nachtmann, H., and Cassady, C., 2005. Genetic algorithms for integrated preventive
maintenance planning and production scheduling for a single machine. Computers in
Industry, 56 (2), pp. 161-168.
Yang, Z., and Yang, G., 2012. Optimization of Aircraft Maintenance plan based on Genetic
Algorithm. Physics Procedia, 33, pp. 580-586.
165.
Martin, M. D. & Miller, K. (1982). Project Planning as the Primary Management
Function. Project Management Quarterly, 13(1), 31–38.